2013, Resources do not synch if from MS Project to SharePoint task list

SharePoint and Project Professional 2013.  I am synching MS Project with a SharePoint task list.  Tasks synch just fine, but I continually get the synch error "We can't synch resource 'resourcename' to the tasks list because the resource does not exist on the SharePoint server.  This resource, and any other resource that doesn't exist in SharePoint, will remain assigned to the tasks in your project plan.".  If I then select one of the tasks in SharePoint, add the same resource (same spelling), then the resource gets synched to that and all other tasks in the plan (after I choose to use the SharePoint revisions in the popup window).

I am connected to Project Server and this happens for both a simple site synch to MS Project as well as if I use Project in visibility mode.  I am posting to this forum because if I can solve the simple synch to SharePoint resources that will solve both issues.  We will have lots of PMs managing lots of projects and I would like to be able to synch resources from MS Project if possible.

Thank you in advance for your assistance.


Larry Christofaro, PMP, MCITP Tribridge


Viewing all articles
Browse latest Browse all 26374

Trending Articles